India is currently in the process of constructing its first-ever cable-stayed bridge, the Anji Khad. The bridge is being built in the Reasi district of the Union Territory of Jammu and Kashmir, as part of the national project of the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project.
Length and Location
The Anji Khad bridge will be a mammoth 80 kilometers long. It will connect the Katra and Reasi section of the Jammu-Baramulla line, making it an essential link for the region’s transportation infrastructure.
Origin and Design
The idea for the Anji Khad bridge was first proposed in 2002 and was declared a “national project.” Initially, it was proposed as an arch bridge, similar to the Chenab Bridge. However, in 2016, Indian Railways changed the design to a cable-stayed bridge, keeping the geographical concerns in mind.
The asymmetrical cable-stayed bridge is balanced on the axis of a central pylon, which is a large vertical tower-like structure. It can withstand winds up to 213 kmph, making it a robust structure.
Other Features
The Anji Khad bridge is a part of the national project of the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project, which aims to connect the Kashmir Valley to the rest of India. The project was commissioned by the Northern Railways and is being executed by Konkan Railway Corporation Ltd. (KRCL) and Hindustan Construction Company.
The completion of the bridge will make it taller than the Eiffel Tower, making it a significant achievement for India’s infrastructure development.
The Importance of the Anji Khad Bridge
The Anji Khad bridge is a vital component of the transportation infrastructure in the region. The bridge will provide a faster and more efficient way of transporting goods and people, as it will link the two essential sections of the Jammu-Baramulla line. This will also help reduce the travel time between the two regions, boosting economic activity in the region.
Furthermore, the bridge’s construction provides employment opportunities for the local population, contributing to the development of the region.
Why In News
India’s first cable-stayed bridge, the Anji Khad, is a major national project and a significant milestone in India’s infrastructure development. The bridge is currently under construction and is expected to be completed soon, providing faster and more efficient transportation links for the region.
MCQs about India’s First Cable-Stayed Bridge
-
What is the length of India’s first cable-stayed bridge, Anji Khad?
A. 50 km
B. 80 km
C. 100 km
D. 120 km
-
In which district is the Anji Khad bridge being constructed?
A. Baramulla district
B. Srinagar district
C. Reasi district
D. Udhampur district
-
What is the design of the Anji Khad bridge?
A. Arch bridge
B. Cable-stayed bridge
C. Suspension bridge
D. Cantilever bridge
-
What is the importance of the Anji Khad bridge?
A. Provides a faster and more efficient way of transporting goods and people.
B. Boosts economic activity in the region.
C. Provides employment opportunities for the local population.
D. All of the above.
Boost up your confidence by appearing our Weekly Current Affairs Multiple Choice Questions